Travel Impact the Week of August 13
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue. Construction is expected to be completed this fall.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue will be in place through late June. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue through August.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of August 6
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue. Construction is expected to be completed this fall.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue will be in place through late June. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of July 30
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue. Construction is expected to be completed this fall.
On Monday, July 31, crews will conduct a traffic shift on Iliff Avenue traffic between US 83 (Parker Road) and Wabash Street, to add the final layer of waterproofing material on the new asphalt on the southbound lanes. Motorists should expect delays, alternate routes advised.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue will be in place through late June. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue.
- Day time single lane and shifting lane closures on Iliff Avenue between Parker Road and Wabash Street on Monday, July 31.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of July 23
ARAPAHOE COUNTY — Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue. Construction is expected to be completed this fall.
Crews will conduct a shift traffic to the south lanes on Iliff Avenue between Wabash Street and US 83 (Parker Road) on Saturday, July 22. This will allow paving operations on the north lanes for the next two weeks. On Monday, July 24, crews will require daytime single lane and shifting lane closures on Iliff Avenue between US 83 (Parker Road) and Wabash Street. Crews will be adding the final layer of waterproofing material on the new asphalt on the northbound lanes. Motorists should expect delays, alternate routes advised.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue is in place. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue.
- Day time single lane and shifting lane closures on Iliff Avenue between Parker Road and Wabash Street on Monday, July 24.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of July 16
ARAPAHOE COUNTY — Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue. Construction is expected to be completed this fall.
Crews will require daytime single lane and shifting lane closures on Iliff Avenue between US 83 (Parker Road) and Wabash Street on Monday, July 24. Crews will be adding the final layer of waterproofing material on the new asphalt on the northbound lanes. Motorists should expect delays, alternate routes advised.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue is in place. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue.
- Day time single lane and shifting lane closures on Iliff Avenue between Parker Road and Wabash Street on Monday, July 24.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of July 9
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue. Construction is expected to be completed this fall.
Crews will require daytime single lane and shifting lane closures on Iliff Avenue between US 83 (Parker Road) and Wabash Street on Saturday, July 15. Crews will be adding the final layer of waterproofing material on the new asphalt on the northbound lanes. Motorists should expect delays, alternate routes advised.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue is in place. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are available. Motorists can either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue.
- Day time single lane and shifting lane closures on Iliff Avenue between Parker Road and Wabash Street during on Saturday, July 15.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of July 2
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue. Construction is expected to be completed this fall.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of June 25
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue. Construction is expected to be completed this fall.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue will be in place through late June. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
The Cherry Creek Trail under Iliff Avenue is now open as crews have completed bridge work and pipe installation on the south side of Iliff Avenue.
Trenton Way at Iliff Avenue is now open as crews have completed underground utility and roadway work.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue through late June.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of June 18
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue will be in place through late June. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Crews will reduce Trenton Way to one lane in each direction at Iliff Avenue to perform underground utility and roadway work. The lane reduction will be in place through early June.
Intermittent closures of the Cherry Creek Trail under Iliff Avenue continue for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue through late June.
- Single lane access in each direction at Trenton Way on the north side of Iliff Avenue through early June.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of June 11
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue will be in place through late June. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Crews will reduce Trenton Way to one lane in each direction at Iliff Avenue to perform underground utility and roadway work. The lane reduction will be in place through early June.
Intermittent closures of the Cherry Creek Trail under Iliff Avenue continue for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue through late June.
- Single lane access in each direction at Trenton Way on the north side of Iliff Avenue through early June.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of June 4
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue will be in place through late June. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Crews will reduce Trenton Way to one lane in each direction at Iliff Avenue to perform underground utility and roadway work. The lane reduction will be in place through early June.
Intermittent closures of the Cherry Creek Trail under Iliff Avenue continue for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue through late June.
- Single lane access in each direction at Trenton Way on the north side of Iliff Avenue through early June.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of May 28
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue will be in place through late June. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Crews will reduce Trenton Way to one lane in each direction at Iliff Avenue to perform underground utility and roadway work. The lane reduction will be in place through early June.
Intermittent closures of the Cherry Creek Trail under Iliff Avenue continue for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue through late June.
- Single lane access in each direction at Trenton Way on the north side of Iliff Avenue through early June.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of May 21
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue will be in place through late June. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Crews will reduce Trenton Way to one lane in each direction at Iliff Avenue to perform underground utility and roadway work. The lane reduction will be in place through May.
Intermittent closures of the Cherry Creek Trail under Iliff Avenue continue for bridge work on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue through late June.
- Single lane access in each direction at Trenton Way on the north side of Iliff Avenue through May.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of May 14
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue will be in place through late June. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Crews will reduce Trenton Way to one lane in each direction at Iliff Avenue to perform underground utility and roadway work. The lane reduction will be in place through May.
Intermittent closures of the Cherry Creek Trail under Iliff Avenue continue for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue through late June.
- Single lane access in each direction at Trenton Way on the north side of Iliff Avenue through May.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of May 7
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue will be in place through late June. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Crews will reduce Trenton Way to one lane in each direction at Iliff Avenue to perform underground utility and roadway work. The lane reduction will be in place through early May.
Intermittent closures of the Cherry Creek Trail under Iliff Avenue continue for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue through late June.
- Single lane access in each direction at Trenton Way on the north side of Iliff Avenue through early May.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of April 30
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
To realign Iliff Avenue traffic and open work areas on the south side, crews will conduct single lane and shifting lane closures on Iliff Avenue between Syracuse Street and Quebec Street during the day on Sunday, April 30. Motorists should expect delays, and alternate routes advised.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue will be in place from Tuesday, May 2, through late June. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Crews will reduce Trenton Way to one lane in each direction at Iliff Avenue to perform underground utility and roadway work. The lane reduction will be in place through early May.
Intermittent closures of the Cherry Creek Trail under Iliff Avenue continue for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Single lane closures on Iliff Avenue between Syracuse Street and Quebec Street on Sunday, April 30.
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue from Tuesday, May 2, through late June.
- Single lane access in each direction at Trenton Way on the north side of Iliff Avenue through the beginning of May.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of April 23
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
To realign Iliff Avenue traffic and open work areas on the south side, crews will conduct single lane and shifting lane closures on Iliff Avenue between Syracuse Street and Quebec Street during the day on Saturday, April 22. Motorists should expect delays. Alternate routes advised.
A full closure of southbound Syracuse Way from eastbound Iliff Avenue will be in place from Saturday, April 22, through mid-June. With the closure, crews will perform underground drainage replacements, reconstruct the median and sidewalks and fully repave the Syracuse Way and Iliff Avenue intersection. Detours are in place. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way, turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way.
Northbound Syracuse Way traffic to eastbound Iliff Avenue will remain open.
Crews will reduce Trenton Way to one lane in each direction at Iliff Avenue to perform underground utility and roadway work. The lane reduction will be in place starting next week through early May.
Intermittent closures of the Cherry Creek Trail under Iliff Avenue continue for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Single lane closures on Iliff Avenue between Syracuse Street and Quebec Street during the day on Saturday, April 22.
- Full closure of southbound Syracuse Street from eastbound Iliff Avenue from Saturday, April 22, through mid-June.
- Single lane access in each direction at Trenton Way on the north side of Iliff Avenue through early May.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of April 16
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
To realign Iliff Avenue traffic and open work areas on the south side, crews will conduct single lane and shifting lane closures on Iliff Avenue between Syracuse Street and Quebec Street during the day on Saturday, April 15. Motorists should expect delays, and alternate routes advised.
Intermittent closures of the Cherry Creek Trail under Iliff Avenue continue for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Single lane closures on Iliff Avenue between Syracuse Street and Quebec Street during the day on Saturday, April 15.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of April 9
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
To realign Iliff Avenue traffic and open work areas on the south side, crews will conduct single lane and shifting lane closures on Iliff Avenue between Syracuse Street and Quebec Street during the day on Saturday, April 15. Motorists should expect delays, and alternate routes advised.
Intermittent closures of the Cherry Creek Trail under Iliff Avenue continue for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Project hotline update: Please note the hotline number to contact the project team has changed. Please call 720-239-2283 or email Iliffave@gmail.com to speak with a member of the project team.
Travel Impacts
- Single lane closures on Iliff Avenue between Syracuse Street and Quebec Street during the day on Saturday, April 15.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of April 2
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
In the coming weeks, crews will adjust the traffic alignment between Rosemary and Quebec streets to the north. This traffic change will allow final paving operations on the south side of Iliff Avenue.
Rosemary Street has opened in each direction at Iliff Avenue. Underground drainage work has been completed.
Intermittent closures of the Cherry Creek Trail under Iliff Avenue continue for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Project hotline update: The hotline number to contact the project team has changed. Please call 720-239-2283 or email Iliffave@gmail.com to speak with a member of the project team.
Travel Impacts
- No anticipated closures.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of March 26
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
In the coming weeks, crews will adjust the traffic alignment between Rosemary and Quebec streets to the north. This traffic change will allow final paving operations on the south side of Iliff Avenue.
Underground utility work continues across Rosemary Street. To safely perform this work, crews have reduced Rosemary Street down to one lane in each direction at Iliff Avenue.
Intermittent closures of the Cherry Creek Trail under Iliff Avenue continue for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Through April 1: Various lane closures on Rosemary Street at Iliff Avenue.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of March 19
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
Crews will reduce Rosemary Street to one lane in each direction at Iliff Avenue for approximately three weeks. The partial closure is due to underground utility work that has started across Rosemary Street.
Intermittent full closures of the Cherry Creek Trail under Iliff Avenue continues for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Through April 1: Various lane closures on Rosemary Street at Iliff Avenue.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of March 12
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
Rosemary Street at Iliff Avenue will be closed for three weeks starting Tuesday, March 14. The closure is due to underground utility work across Rosemary Street. A detour is in place during the closure. Eastbound motorists are advised to continue east on Iliff Avenue, turn left on Trenton Way to access the business park off Rosemary Street. Westbound motorists are advised to continue west on Iliff Avenue to the business park entrance or turn right onto northbound Quebec Street and right on Warren Drive.
Intermittent full closures of the Cherry Creek Trail under Iliff Avenue continues for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Beginning Tuesday, March 14: Full closure of Rosemary Street at Iliff Avenue.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of March 5
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
Intermittent full closures of the Cherry Creek Trail under Iliff Avenue will continue for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- There are no anticipated closures on Iliff Avenue.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of Feb. 26
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
A full closure of southbound Syracuse Way from Iliff Avenue is in place through February due to a water main break. Crews are reconstructing and repaving the Syracuse Way and Iliff Avenue intersection. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way to turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way. Northbound Syracuse Way traffic to eastbound Iliff Avenue will be maintained throughout the closure. Review the detour map.
Intermittent full closures of the Cherry Creek Trail under Iliff Avenue will continue through February for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of southbound Syracuse Way from eastbound Iliff Avenue.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of Feb. 19
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
Single lane and shifting lane closures took place on Monday, Feb. 20, between Yosemite and Quebec streets. Traffic has been shifted to southern lanes.
A full closure of southbound Syracuse Way from Iliff Avenue is in place through February due to a water main break. Crews are reconstructing and repaving the Syracuse Way and Iliff Avenue intersection. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue east on Iliff Avenue to Trenton Way to turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way. Northbound Syracuse Way traffic to eastbound Iliff Avenue will be maintained throughout the closure. Review the detour map.
Intermittent full closures of the Cherry Creek Trail under Iliff Avenue will continue through February for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Single lane and shifting lane closures on Iliff Avenue between Yosemite and Quebec streets on Monday, Feb. 20.
- Full closure of southbound Syracuse Way from eastbound Iliff Avenue.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of Feb. 12
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
A full closure of southbound Syracuse Way from Iliff Avenue is in place through February due to a water main break. Crews will reconstruct and repave the Syracuse Way and Iliff Avenue intersection. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue on east on Iliff Avenue to Trenton Way to turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way. Northbound Syracuse Way traffic to eastbound Iliff Avenue will be maintained throughout the closure. Review the detour map.
Intermittent full closures of the Cherry Creek Trail under Iliff Avenue will continue through February for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of southbound Syracuse Way from eastbound Iliff Avenue.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of Feb. 5
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
Crews have fully closed Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
A full closure of southbound Syracuse Way from Iliff Avenue is in place through February due to a water main break. Crews will reconstruct and repave the Syracuse Way and Iliff Avenue intersection. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue on east on Iliff Avenue to Trenton Way to turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way. Northbound Syracuse Way traffic to eastbound Iliff Avenue will be maintained throughout the closure. Review the detour map.
Intermittent full closures of the Cherry Creek Trail under Iliff Avenue will continue through February for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
- Full closure of southbound Syracuse Way from eastbound Iliff Avenue.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of Jan. 29
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
Crews have fully closed Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
A full closure of southbound Syracuse Way from Iliff Avenue is in place through February due to a water main break. Crews will reconstruct and repave the Syracuse Way and Iliff Avenue intersection. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue on east on Iliff Avenue to Trenton Way to turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way. Northbound Syracuse Way traffic to eastbound Iliff Avenue will be maintained throughout the closure. Review the detour map.
Intermittent full closures of the Cherry Creek Trail under Iliff Avenue will continue through February for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
- Full closure of southbound Syracuse Way from eastbound Iliff Avenue.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of Jan. 22
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
Crews have fully closed Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
A full closure of southbound Syracuse Way from Iliff Avenue is in place through February due to a water main break. Crews will reconstruct and repave the Syracuse Way and Iliff Avenue intersection. Motorists will either detour south on Quebec Street to Harvard Avenue and turn east to access Syracuse Way or continue on east on Iliff Avenue to Trenton Way to turn south. Continue south to Harvard Avenue, turn west to access Syracuse Way. Northbound Syracuse Way traffic to eastbound Iliff Avenue will be maintained throughout the closure. Review the detour map.
Intermittent full closures of the Cherry Creek Trail under Iliff Avenue will continue through February for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
- Full closure of southbound Syracuse Way from eastbound Iliff Avenue.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of Jan. 15
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
Crews have fully closed Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Intermittent full closures of the Cherry Creek Trail under Iliff Avenue will start in mid-January for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact the Week of Jan. 8
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work is ongoing on Iliff Avenue.
Crews have fully closed Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Intermittent full closures of the Cherry Creek Trail under Iliff Avenue will start in mid-January for bridge work and pipe installation on the south side of Iliff Avenue. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
View the updated RTD bus stop closures.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of Jan. 1
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground operations are ongoing on Iliff Avenue.
There will be no traffic impacts over the holiday weekend from Saturday, Dec. 31, through Monday, Jan. 2.
Crews have fully closed Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
The Cherry Creek Trail at Iliff Avenue will have intermittent closures in January. Detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and cross at the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
- The RTD bus stops on Iliff Avenue at Syracuse Way, east of Highline Canal Trail and east of Dayton Way are currently closed.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of Dec. 25
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Asphalt paving and underground work will continue on Iliff Avenue.
Crews have fully closed Cherry Creek Drive at Iliff Avenue for underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Motorists can expect single lane and shifting lane closures on Iliff Avenue between Dayton Street and Trenton Way.
The Cherry Creek Trail is closed at Iliff Avenue for bridge work. A detour is in place. Trail users detour from the trail to Cherry Creek Drive at Iliff Avenue then go east on Iliff Avenue to Valentia Street to use the crosswalk to the south side of Iliff Avenue. Trail users will then go west to join the trail on the east side of the bridge. Always use signalized pedestrian crossings to cross Iliff Avenue.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
- Single lane and shifting lane closure on Iliff Avenue between Dayton Street and Trenton Way.
- The RTD bus stops on Iliff Avenue at Syracuse Way, east of Highline Canal Trail and east of Dayton Way are currently closed.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for Week of Dec. 18
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals are ongoing on Iliff Avenue.
On Wednesday, Dec. 21, traffic will be shifted into a temporary alignment. Motorists can expect single lane and shifting lane closures between Dayton Street and Trenton Way.
The Cherry Creek Trail at Iliff Avenue will close on Thursday, Dec. 22, for work on the south side of Iliff Avenue. A detour will be in place. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and use the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge.
Cherry Creek Drive at Iliff Avenue remains closed as crews install underground drainage. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
- Single lane and shifting lane closure on Iliff Avenue between Dayton Street and Trenton Way.
- The RTD bus stops on Iliff Avenue at Syracuse Way, east of Highline Canal Trail and east of Dayton Way are currently closed.
Stay Informed
More information is available at:
Phone: 720-239-2283
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of Dec. 11
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals are ongoing on Iliff Avenue.
On Wednesday, Dec. 21, traffic will be shifted into a temporary alignment. Motorists can expect single lane and shifting lane closures between Dayton Street and Trenton Way.
The Cherry Creek Trail at Iliff Avenue will close on Dec. 22 for work on the south side of Iliff Avenue. A detour will be in place. Trail users will detour from the trail to Cherry Creek Drive at Iliff Avenue. Go east on Iliff Avenue to Valentia Street and use the crosswalk to the south side of Iliff Avenue. Go west to join the trail on the east side of the bridge.
Cherry Creek Drive at Iliff Avenue remains closed as crews install underground drainage. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
- Single lane and shifting lane closure on Iliff Avenue between Dayton Street and Trenton Way.
- The RTD bus stops on Iliff Avenue at Syracuse Way, east of Highline Canal Trail and east of Dayton Way are currently closed.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of Dec. 4
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals are ongoing on Iliff Avenue.
Cherry Creek Drive at Iliff Avenue remains closed as crews install underground drainage. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Crews have reopened the Cherry Creek Trail at Iliff Avenue after completing pipe installation and bridge work. An additional full closure of the trail will be required later this month for work on the south side of Iliff Avenue. A detour will be in place.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
- The RTD bus stops on Iliff Avenue at Syracuse Way, east of Highline Canal Trail and east of Dayton Way are currently closed.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of Nov. 27
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals are ongoing on Iliff Avenue.
Crews will cease operations at 12 p.m. Wednesday, Nov. 23, for Thanksgiving. Work will resume on Monday, Nov. 28.
Cherry Creek Drive at Iliff Avenue remains closed as crews install underground drainage. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Crews have reopened the Cherry Creek Trail at Iliff Avenue after completing pipe installation and bridge work. An additional full closure of the trail will be required in mid-December for work on the south side of Iliff Avenue. A detour will be in place.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
- The RTD bus stops on Iliff Avenue at Syracuse Way, east of Highline Canal Trail and east of Dayton Way are currently closed.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of Nov. 20
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals are ongoing on Iliff Avenue.
Access has been restored to Wabash Street from Iliff Avenue and Iliff Avenue from Yosemite Street on the north side of Iliff Avenue.
Crews have fully closed Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Crews have reopened the Cherry Creek Trail at Iliff Avenue after completing pipe installation and bridge work. A full closure of the trail will be required in mid-December for work on the south side of Iliff Avenue.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
- The RTD bus stops on Iliff Avenue at Syracuse Way, east of Highline Canal Trail and east of Dayton Way are currently closed.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of Nov. 13
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals are ongoing on Iliff Avenue.
The Cherry Creek Trail will reopen on Tuesday, Nov. 15. Crews have completed the north portion of the bridge work and underground pipe installation on the trail at Iliff Avenue. Crews will now begin preparations for bridge and drainage work on the south side of Iliff Avenue. An additional full closure of the trail will be required for work on the south side of Iliff Avenue in mid-December.
Crews have restricted access to Wabash Street from Iliff Avenue and access to Iliff Avenue from Yosemite Street on the north side of Iliff Avenue. Motorists are advised to continue to use Warren Avenue for access.
Crews have fully closed Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue starting Monday, Nov. 14.
- Full closure of the Cherry Creek Trail under Iliff Avenue until Tuesday, Nov. 15.
- Closure of access to Wabash Street from Iliff Avenue on the north side of Iliff.
- Closure of access from Yosemite Street to Iliff Avenue on the north side of Iliff.
- The RTD bus stops on Iliff Avenue at Syracuse Way, east of Highline Canal Trail and east of Dayton Way are currently closed.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impact for the Week of Nov. 6
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals are ongoing on Iliff Avenue.
Crews have restricted access to Wabash Street from Iliff Avenue and access to Iliff Avenue from Yosemite Street on the north side of Iliff Avenue. Motorists are advised to continue to use Warren Avenue for access.
Crews have fully closed Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
To perform bridge work and underground pipe installation, a full closure of the Cherry Creek Trail at Iliff Avenue is currently in place. Detour south along Cherry Creek Drive to Iliff Avenue. Go west of Iliff Avenue to Trenton Way and cross at the crosswalk to the south side of Iliff Avenue. Use the temporary detour path to go east to join the trail on the east side of the bridge.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
- Full closure of the Cherry Creek Trail under Iliff Avenue.
- Closure of access to Wabash Street from Iliff Avenue on the north side of Iliff Avenue.
- Closure of access from Yosemite Street to Iliff Avenue on the north side of Iliff Avenue.
- The RTD bus stops on Iliff Avenue at Syracuse Way, east of Highline Canal Trail and east of Dayton Way are currently closed.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Oct. 30
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals are ongoing on Iliff Avenue.
Crews have restricted access to Wabash Street from Iliff Avenue and access to Iliff Avenue from Yosemite Street on the north side of Iliff Avenue. Motorists are advised to use Warren Avenue for access.
Crews have fully close Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
To perform bridge work and underground pipe installation, a full closure of the Cherry Creek Trail at Iliff Avenue is currently in place. Detour south along Cherry Creek Drive to Iliff Avenue. Go west of Iliff Avenue to Trenton Way and cross at the crosswalk to the south side of Iliff Avenue. Use the temporary detour path to go east to join the trail on the east side of the bridge.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
- Full closure of the Cherry Creek Trail under Iliff Avenue.
- Closure of access to Wabash Street from Iliff Avenue on the north side of Iliff.
- Closure of access from Yosemite Street to Iliff Avenue on the north side of Iliff.
- The RTD bus stops on Iliff Avenue at Syracuse Way, east of Highline Canal Trail and east of Dayton Way are currently closed.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Oct. 23
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals are ongoing on Iliff Avenue.
Access from Wabash Street to Iliff Avenue and access from Iliff Avenue to Yosemite Street is restricted on the north side of Iliff Avenue through Monday, Oct. 24. Motorists are advised to use Warren Avenue for access.
On Monday, Oct. 24, crews will restrict access to Wabash Street from Iliff Avenue and access to Iliff Avenue from Yosemite Street on the north side of Iliff Avenue. Motorists are advised to continue to use Warren Avenue for access.
Crews have fully close Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
To perform bridge work and underground pipe installation, a full closure of the Cherry Creek Trail at Iliff Avenue is currently in place. Detour south along Cherry Creek Drive to Iliff Avenue. Go west of Iliff Avenue to Trenton Way and cross at the crosswalk to the south side of Iliff Avenue. Use the temporary detour path to go east to join the trail on the east side of the bridge.
Travel Impacts
- Full closure of Cherry Creek Drive at Iliff Avenue.
- Full closure of the Cherry Creek Trail under Iliff Avenue.
- Closure of access to Wabash Street from Iliff Avenue on the north side of Iliff starting Oct. 24.
- Closure of access from Yosemite Street to Iliff Avenue on the north side of Iliff starting Oct. 24.
- The RTD bus stops on Iliff Avenue at Syracuse Way, east of Highline Canal Trail and east of Dayton Way are currently closed.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Oct. 16
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue this week. Road excavation continues on the north side of Iliff Avenue.
Crews will open access to Trenton Way on Tuesday, Oct. 17. Trenton Way on the south side of Iliff Avenue has been closed to complete underground drainage installation. Until the road re-opens, motorists are advised to utilize Syracuse Way and Harvard Avenue to access Trenton Way.
Crews have restricted access from Wabash Street to Iliff Avenue and access from Iliff Avenue to Yosemite Street on the north side of Iliff Avenue. Motorists are advised to use Warren Avenue for access. On Tuesday, Oct. 17, crews will reverse access on Yosemite Street and Wabash Street. Crews will restrict access to Wabash Street from Iliff Avenue and access to Iliff Avenue from Yosemite Street on the north side of Iliff. Motorists are advised to continue to use Warren Avenue for access
To perform bridge work and underground pipe installation, a full closure of the Cherry Creek Trail at Iliff Avenue is in place for four weeks. Detour south along Cherry Creek Drive to Iliff Avenue. Go west of Iliff Avenue to Trenton Way and cross at the crosswalk to the south side of Iliff Avenue. Use the temporary detour path to go east to join the trail on the east side of the bridge.
Crews have closed Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
Travel Impacts
- Full closure of Trenton Way on the south side of Iliff Avenue until Oct. 17.
- Full closure of Cherry Creek Drive at Iliff Avenue.
- Full closure of the Cherry Creek Trail under Iliff Avenue.
- Closure of access from Wabash Street to Iliff Avenue on the north side of Iliff until Oct. 17.
- Closure of access to Yosemite Street from Iliff Avenue on the north side of Iliff until Oct. 17.
- Closure of access to Wabash Street from Iliff Avenue on the north side of Iliff starting Oct. 17.
- Closure of access from Yosemite Street to Iliff Avenue on the north side of Iliff starting Oct. 17.
- The RTD bus stops on Iliff Avenue at Dayton Street and Yosemite Street have reopened. RTD stop on Iliff Avenue east of Wabash Street is currently closed.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Oct. 9
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue this week. Road excavation continues on the north side of Iliff Avenue.
To perform bridge work and underground pipe installation, a full closure of the Cherry Creek Trail at Iliff Avenue is in place for four weeks. Detour south along Cherry Creek Drive to Iliff Avenue. Go west of Iliff Avenue to Trenton Way and cross at the crosswalk to the south side of Iliff Avenue. Use the temporary detour path to go east to join the trail on the east side of the bridge.
Crews have fully closed Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Trenton Way on the south side of Iliff Avenue is closed for a month to complete underground drainage installation. Motorists are advised to utilize Syracuse Way and Harvard Avenue to access Trenton Way.
Crews have restricted access from Wabash Street to Iliff Avenue and access from Iliff Avenue to Yosemite Street on the north side of Iliff Avenue. Motorists are advised to use Warren Avenue for access.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
To remove and replace the sidewalk on the north side of Iliff Avenue, the sidewalk between Wabash Street and Yosemite Circle is closed. Pedestrian traffic will detour to the south side of Iliff Avenue.
Travel Impacts
- Full closure of Trenton Way on the south side of Iliff Avenue for approximately one month.
- Full closure of Cherry Creek Drive at Iliff Avenue for approximately one month.
- Full closure of the Cherry Creek Trail under Iliff Avenue for approximately one month.
- Closure of access from Wabash Street to Iliff Avenue on the north side of Iliff Avenue.
- Closure of access to Yosemite Street from Iliff Avenue on the north side of Iliff Avenue.
- The RTD bus stops on Iliff Avenue at Dayton Street and Yosemite Street have reopened. RTD stop on Iliff Avenue east of Wabash Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Oct. 2
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue this week. Road excavation continues on the north side of Iliff Avenue.
To perform bridge work and underground pipe installation, a full closure of the Cherry Creek Trail at Iliff Avenue is in place for four weeks. Detour south along Cherry Creek Drive to Iliff Avenue. Go west of Iliff Avenue to Trenton Way and cross at the crosswalk to the south side of Iliff Avenue. Use the temporary detour path to go east to join the trail on the east side of the bridge.
Crews have fully closed Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Trenton Way on the south side of Iliff Avenue is closed for a month to complete underground drainage installation. Motorists are advised to utilize Syracuse Way and Harvard Avenue to access Trenton Way.
Crews have restricted access from Wabash Street to Iliff Avenue and access from Iliff Avenue to Yosemite Street on the north side of Iliff Avenue. Motorists are advised to use Warren Avenue for access.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
To remove and replace the sidewalk on the north side of Iliff Avenue, the sidewalk between Wabash Street and Yosemite Circle is closed. Pedestrian traffic will detour to the south side of Iliff Avenue.
Travel Impacts
- Full closure of Trenton Way on the south side of Iliff Avenue for approximately one month.
- Full closure of Cherry Creek Drive at Iliff Avenue for approximately one month.
- Full closure of the Cherry Creek Trail under Iliff Avenue for approximately one month.
- Closure of access from Wabash Street to Iliff Avenue on the north side of Iliff Avenue.
- Closure of access to Yosemite Street from Iliff Avenue on the north side of Iliff Avenue.
- The RTD bus stops on Iliff Avenue at Dayton Street and Yosemite Street have reopened. RTD stop on Iliff Avenue east of Wabash Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Sept. 25
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue this week. Road excavation continues on the north side of Iliff Avenue.
To perform bridge work and underground pipe installation, a full closure of the Cherry Creek Trail at Iliff Avenue is in place for four weeks. Detour south along Cherry Creek Drive to Iliff Avenue. Go west of Iliff Avenue to Trenton Way and cross at the crosswalk to the south side of Iliff Avenue. Use the temporary detour path to go east to join the trail on the east side of the bridge.
Crews have fully closed Cherry Creek Drive at Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Trenton Way on the south side of Iliff Avenue is closed for a month to complete underground drainage installation. Motorists are advised to utilize Syracuse Way and Harvard Avenue to access Trenton Way.
Crews have restricted access from Wabash Street to Iliff Avenue and access from Iliff Avenue to Yosemite Street on the north side of Iliff Avenue. Motorists are advised to use Warren Avenue for access.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
To remove and replace the sidewalk on the north side of Iliff Avenue, the sidewalk between Wabash Street and Yosemite Circle is closed. Pedestrian traffic will detour to the south side of Iliff Avenue.
Travel Impacts
- Full closure of Trenton Way on the south side of Iliff Avenue for approximately one month.
- Full closure of Cherry Creek Drive at Iliff Avenue for approximately one month.
- Full closure of the Cherry Creek Trail under Iliff Avenue for approximately one month.
- Closure of access from Wabash Street to Iliff Avenue on the north side of Iliff Avenue.
- Closure of access to Yosemite Street from Iliff Avenue on the north side of Iliff Avenue.
- The RTD bus stops on Iliff Avenue at Dayton Street and Yosemite Street have reopened. RTD stop on Iliff Avenue east of Wabash Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for Week of Sept. 18
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue this week. Road excavation continues on the north side of Iliff Avenue.
To perform bridge work and underground pipe installation, a full closure of the Cherry Creek Trail at Iliff Avenue will be in place on Monday, Sept. 19, for four weeks. Detour south along Cherry Creek Drive to Iliff Avenue. Go west of Iliff Avenue to Trenton Way and cross at the crosswalk to the south side of Iliff Avenue. Use the temporary detour path to go east to join the trail on the east side of the bridge.
Crews will fully close Cherry Creek Drive at Iliff Avenue starting Tuesday, Sept. 20, to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Trenton Way on the south side of Iliff Avenue is closed for a month to complete underground drainage installation. Motorists are advised to utilize Syracuse Way and Harvard Avenue to access Trenton Way.
Crews have restricted access from Wabash Street to Iliff Avenue and access from Iliff Avenue to Yosemite Street on the north side of Iliff Avenue. Motorists are advised to use Warren Avenue for access.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
To remove and replace the sidewalk on the north side of Iliff Avenue, the sidewalk between Wabash Street and Yosemite Circle is closed. Pedestrian traffic will detour to the south side of Iliff Avenue.
Travel Impacts
- Full closure of Trenton Way on the south side of Iliff Avenue for approximately one month.
- Full closure of Cherry Creek Drive at Iliff Avenue for approximately one month.
- Full closure of the Cherry Creek Trail under Iliff Avenue for approximately one month.
- Closure of access from Wabash Street to Iliff Avenue on the north side of Iliff Avenue.
- Closure of access to Yosemite Street from Iliff Avenue on the north side of Iliff Avenue.
- The RTD bus stops on Iliff Avenue at Dayton Street and Yosemite Street have reopened. RTD stop on Iliff Avenue east of Wabash Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Sept. 11
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue this week. Road excavation continues on the north side of Iliff Avenue.
Trenton Way on the south side of Iliff Avenue is closed for a month to complete underground drainage installation. Motorists are advised to utilize Syracuse Way and Harvard Avenue to access Trenton Way.
Crews have restricted access from Wabash Street to Iliff Avenue and access from Iliff Avenue to Yosemite Street on the north side of Iliff Avenue. Motorists are advised to use Warren Avenue for access.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
The Cherry Creek Trail is currently open under Iliff Avenue. To perform bridge construction, temporary closures and flagging operations require cyclists to dismount intermittently.
To remove and replace the sidewalk on the north side of Iliff Avenue crews will close the sidewalk between Wabash Street and Yosemite Circle. Pedestrian traffic will detour to the south side of Iliff Avenue.
Travel Impacts
- Full closure of Trenton Way on the south side of Iliff Avenue for approximately one month.
- Closure of access from Wabash Street to Iliff Avenue on the north side of Iliff Avenue.
- Closure of access to Yosemite Street from Iliff Avenue on the north side of Iliff Avenue.
- The RTD bus stops on Iliff Avenue at Dayton Street and Yosemite Street have reopened. RTD stop on Iliff Avenue east of Wabash Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Sept. 2
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue this week. Road excavation continues on the north side of Iliff Avenue.
Trenton Way on the south side of Iliff Avenue is closed for a month to complete underground drainage installation. Motorists are advised to utilize Syracuse Way and Harvard Avenue to access Trenton Way.
Crews have restricted access from Wabash Street to Iliff Avenue and access from Iliff Avenue to Yosemite Street on the north side of Iliff Avenue. Motorists are advised to use Warren Avenue for access.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
The Cherry Creek Trail is currently open under Iliff Avenue. To perform bridge construction, temporary closures and flagging operations require cyclists to dismount intermittently.
To remove and replace the sidewalk on the north side of Iliff Avenue crews will close the sidewalk between Wabash Street and Yosemite Circle. Pedestrian traffic will detour to the south side of Iliff Avenue.
Travel Impacts
- Full closure of Trenton Way on the south side of Iliff Avenue for approximately one month.
- Closure of access from Wabash Street to Iliff Avenue on the north side of Iliff Avenue.
- Closure of access to Yosemite Street from Iliff Avenue on the north side of Iliff Avenue.
- The RTD bus stops on Iliff Avenue at Dayton Street and Yosemite Street have reopened. RTD stop on Iliff Avenue east of Wabash Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Aug. 28
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue this week. Road excavation continues on the north side of Iliff Avenue.
Crews will shift Iliff Avenue traffic to the north between Quebec Street and Syracuse Way on Wednesday, Aug. 31. To safely shift traffic, crews will implement single lane and shifting lane closures. Motorists should expect delays.
The Cherry Creek Trail is currently open under Iliff Avenue. To perform bridge construction, temporary closures and flagging operations require cyclists to dismount intermittently.
Trenton Way on the south side of Iliff Avenue is closed for a month to complete underground drainage installation. Motorists are advised to utilize Syracuse Way and Harvard Avenue to access Trenton Way.
Crews have restricted access from Wabash Street to Iliff Avenue and access from Iliff Avenue to Yosemite Street on the north side of Iliff Avenue. Motorists are advised to use Warren Avenue for access.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
The northside sidewalk on Iliff Avenue between Wabash Street and Yosemite Circle is closed as crews construct a new sidewalk. Pedestrian are to use the detour on the south side of Iliff Avenue.
Travel Impacts
- Full closure of Trenton Way on the south side of Iliff Avenue for one month.
- Access from Wabash Street to Iliff Avenue on the north side is closed.
- Access to Yosemite Street from Iliff Avenue on the north side is closed.
- The RTD bus stops on Iliff Avenue at Dayton Street and Yosemite Street have reopened. RTD stop on Iliff Avenue east of Wabash Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Aug. 21
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue this week. Road excavation continues on the north side of Iliff Avenue.
The Cherry Creek trail will be closed at Iliff Avenue the week of Aug. 21 as bridge work is performed. During the closure, trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join the trail on the other side. Once the trail reopens, temporary flagging operations will require cyclists to dismount intermittently as construction continues.
Westbound Iliff Avenue traffic will be reduced to one lane from Valentia Street to Trenton Way as crews perform bridge work over the Cherry Creek. Motorists should expect delays.
Trenton Way on the south side of Iliff Avenue is closed for a month to complete underground drainage installation. Motorists are advised to utilize Syracuse Way and Harvard Avenue to access Trenton Way.
Crews have restricted access from Wabash Street to Iliff Avenue and access from Iliff Avenue to Yosemite Street on the north side of Iliff Avenue. Motorists are advised to use Warren Avenue for access.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
The northside sidewalk on Iliff Avenue between Wabash Street and Yosemite Circle is closed as crews construct a new sidewalk. Pedestrian are to use the detour on the south side of Iliff Avenue.
Travel Impacts
- Single lane and shifting lane closures on Iliff Avenue between Quebec Street and Syracuse Way starting Wednesday, Aug. 31.
- Full closure of Trenton Way on the south side of Iliff Avenue for one month.
- Access from Wabash Street to Iliff Avenue on the north side is closed.
- Access to Yosemite Street from Iliff Avenue on the north side is closed.
- The RTD bus stops on Iliff Avenue at Dayton Street and Yosemite Street have reopened. RTD stop on Iliff Avenue east of Wabash Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Aug. 14
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue this week. Road excavation and removals continue on the north side of Iliff Avenue.
Crews have fully closed Trenton Way on the south side of Iliff Avenue to complete underground drainage installation. The closure will be in place for one month. Motorists are advised to utilize Syracuse Way and Harvard Avenue to access Trenton Way.
Crews have restricted access from Wabash Street to Iliff Avenue and access from Iliff Avenue to Yosemite Street on the north side of Iliff Avenue. Motorists are advised to use Warren Avenue for access.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
The Cherry Creek Trail is currently open under Iliff Avenue. As construction continues temporary flagging operations requiring cyclists to dismount intermittently.
To remove and replace the sidewalk on the north side of Iliff Avenue, the sidewalk between Wabash Street and Yosemite Circle is closed. Pedestrian traffic will detour to the south side of Iliff Avenue.
Travel Impacts
- Full closure of Trenton Way on the south side of Iliff Avenue for one month.
- Access from Wabash Street to Iliff Avenue on the north side is closed.
- Access to Yosemite Street from Iliff Avenue on the north side is closed.
- The RTD bus stops on Iliff Avenue at Dayton Street and Yosemite Street have reopened. RTD stop on Iliff Avenue east of Wabash Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Aug. 7
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals continue on the north side of Iliff Avenue.
To complete underground drainage installation, crews have fully closed Trenton Way on the south side of Iliff Avenue and will continue for one month. Motorists are advised to utilize Syracuse Way and Harvard Avenue to access Trenton Way.
Traffic will be shifted at Wabash and Yosemite streets to the north on Tuesday, Aug. 9. Once shifted, crews will restrict access from Wabash Street to Iliff Avenue and access from Iliff Avenue to Yosemite Street on the north side of Iliff Avenue. Motorists are advised to use Warren Avenue for access.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
The Cherry Creek Trail is currently open under Iliff Avenue. As construction continues, temporary flagging operations requiring cyclists to dismount intermittently.
Crews have closed the sidewalk between Wabash Street and Yosemite Circle to replace the sidewalk on the north side of Iliff Avenue. Pedestrian traffic will detour to the south side of Iliff Avenue.
Travel Impacts
- Full closure of Trenton Way on the south side of Iliff Avenue for approximately one month.
- Closure of access from Wabash Street to Iliff Avenue on the north side of Iliff Avenue.
- Closure of access to Yosemite Street from Iliff Avenue on the north side of Iliff Avenue.
- The RTD bus stops on Iliff Avenue at Dayton Street and Yosemite Street have reopened. RTD stop on Iliff Avenue east of Wabash Street is currently closed.
- Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of July 31
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals continue on the north side of Iliff Avenue.
Traffic will be shifted to the north between Parker Road and Yosemite Circle to open work area for future roadway widening. Lane closures will be in effect during the daytime hours on Saturday, July 30. Motorists should expect delays.
Traffic will be shifted to the north between Rosemary Street and Trenton Way to begin underground drainage installation. Lane closures will be in effect during the nighttime hours on Monday, Aug. 1. Motorists should expect delays.
To complete underground drainage installation across Trenton Way at Iliff Avenue, crews will fully close Trenton Way on the south side of Iliff Avenue starting Tuesday, Aug. 2. The closure will be in effect for one month. Motorists are advised to use Syracuse Way and Harvard Avenue to access Trenton Way.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
The Cherry Creek Trail is currently open under Iliff Avenue. As construction continues, temporary flagging operations requiring cyclists to dismount intermittently.
The sidewalk between Wabash Street and Yosemite Circle is closed to remove and replace the sidewalk on the north side of Iliff Avenue. A pedestrian detour is in place on the south side of Iliff Avenue.
Travel Impacts
- Full closure of Trenton Way on the south side of Iliff Avenue starting Tuesday, Aug. 2 for one month.
- RTD bus stops on Iliff Avenue at Dayton Street and Yosemite Street have reopened. RTD stop on Iliff Avenue east of Wabash Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of July 24
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removal operations are ongoing on the north side of Iliff Avenue.
On Thursday, July 28, traffic will be shifted to the north on Iliff Avenue between Rosemary Street and Trenton Way. To shift traffic, lane closures will be in effect during the day on July 28. Motorists should expect delays.
Also on Thursday, July 28, crews will fully close Trenton Way on the south side of Iliff Avenue to complete underground drainage installation across Trenton Way. The closure will remain in place for one month.
The sidewalk on the north side of Iliff Avenue between Wabash Street and Yosemite Circle is closed to remove and replace the sidewalk. Pedestrians are being detoured to the south side of Iliff Avenue.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
The Cherry Creek Trail is currently open under Iliff Avenue. As construction continues, temporary flagging operations require cyclists to dismount intermittently.
Travel Impacts
- Full closure of Trenton Way on the south side of Iliff Avenue starting Thursday, July 28 for approximately one month.
- The RTD bus stops on Iliff Avenue at Dayton Street and Yosemite Street have reopened. RTD stop on Iliff Avenue east of Wabash Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of July 17
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removal operations are ongoing on the north side of Iliff Avenue.
The sidewalk on the north side of Iliff Avenue between Wabash Street and Yosemite Circle is closed to remove and replace the sidewalk. Pedestrians are being detoured to the south side of Iliff Avenue.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
The Cherry Creek Trail is currently open under Iliff Avenue. As construction continues, temporary flagging operations require cyclists to dismount intermittently.
Travel Impacts
- The RTD bus stops on Iliff Avenue at Dayton Street and Yosemite Street have reopened. The RTD stop on Iliff Avenue east of Wabash Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of July 10
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removal operations are ongoing on the north side of Iliff Avenue.
Crews will close the sidewalk between Wabash Street and Yosemite Circle to remove and replace the sidewalk on the north side of Iliff Avenue. Pedestrian traffic will detour to the south side of Iliff Avenue.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress.
The Cherry Creek Trail is currently open under Iliff Avenue. As construction continues, temporary flagging operations require cyclists to dismount intermittently.
Travel Impacts
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue has reopened. RTD stop on Iliff Avenue west of Dayton Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of July 3
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals will continue on the north side of Iliff Avenue.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress. Crews have completed sidewalk replacement and have reopened the north connection on Iliff Avenue at the High Line Canal Trail.
To remove and replace the sidewalk on the north side of Iliff Avenue crews will close the sidewalk between Yosemite Street and Yosemite Circle. Pedestrian traffic will detour to the south side of Iliff Avenue.
The Cherry Creek Trail is currently open under Iliff Avenue. As construction continues, temporary flagging operations require cyclists to dismount intermittently.
Travel Impacts
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue has reopened. RTD stop on Iliff Avenue west of Dayton Street is currently closed.
- Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of June 26
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals continue on the north side of Iliff Avenue. Partial closures of Dayton Street and Dayton Way for underground drainage installation have reopened.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress. To reconstruct the sidewalk on the north side of Iliff Avenue at the High Line Canal Trail, crews have closed the north connection from the High Line Canal Trail to Iliff Avenue for approximately four more weeks. Trail users are advised to use the trail connection on the south side of Iliff Avenue.
A temporary pedestrian crossing will be opened across Iliff Avenue at Valentia Street to allow crossing from the new sidewalk on the south of Iliff Avenue to the north side.
The Cherry Creek Trail is currently open under Iliff Avenue. As construction continues, temporary flagging operations require cyclists to dismount intermittently.
Travel Impacts
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue has reopened. The RTD stop on Iliff Avenue west of Dayton Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of June 19
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals will continue on the north side of Iliff Avenue. Partial closures of Dayton Street and Dayton Way for underground drainage installation will reopen Tuesday, June 21.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues. To reconstruct the sidewalk on the north side of Iliff Avenue at the trail, crews have closed the north connection from the High Line Canal Trail to Iliff Avenue for approximately four more weeks. Trail users are advised to use the trail connection on the south side of Iliff Avenue. The work at the trail includes bike trail reconstruction, bridge rehabilitation and environmental improvements.
The Cherry Creek Trail is currently open under Iliff Avenue. As construction continues temporary flagging operations requiring cyclists to dismount will be required intermittently.
Travel Impacts
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue has reopened. RTD stop on Iliff Avenue west of Dayton Street is currently closed.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of June 12
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Motorists and pedestrians be aware of road excavation and removals on the north side of Iliff Avenue.
For the next week, crews have closed portions of the High Line Canal and Cherry Creek trails at Iliff Avenue.
To reconstruct the sidewalk on the north side of Iliff Avenue, crews have closed the north connection from the High Line Canal Trail to Iliff Avenue. Trail users are advised to use the trail connection on the south side of Iliff Avenue. Work on the trail also includes bike trail reconstruction, bridge rehabilitation and environmental improvements.
The Cherry Creek Trail is closed as crews perform bridge work over the Cherry Creek. Trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side. Crew have also restricted westbound Iliff Avenue traffic to one lane from Valentia Street to Trenton Way due to the bridge work. Motorists should expect delays.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Travel Impacts
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic and Transit Impacts for the Week of May 30
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals continue on the north side of Iliff Avenue. Emporia Street, Dayton Way and Dayton Street are now open to two-way traffic.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress. To reconstruct the sidewalk on the north side of Iliff Avenue at the High Line Canal Trail, crews will close the north connection from the High Line Canal Trail to Iliff Avenue starting Tuesday, May 31, for approximately two weeks. Trail users are advised to use the trail connection on the south side of Iliff Avenue.
The Cherry Creek Trail is currently open under Iliff Avenue, but a closure will occur next week. To perform bridge work, the Cherry Creek trail will be closed on Tuesday, May 31, for about two weeks. Trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side. Bridge work over Cherry Creek will also require crews to restrict westbound Iliff Avenue traffic to one lane from Valentia Street to Trenton Way over Cherry Creek Trail. Motorists should expect delays.
Travel Impacts
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic and Transit Impacts for the Week of May 23
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. To shift traffic and open work areas, crews will conduct shifting lane closures on Iliff Avenue from Wabash Street to Cherry Creek Drive on Wednesday, May 25. Motorists should expect delays.
Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use Trenton Way to the west to access Cherry Creek Drive.
Motorists can expect delays on westbound Iliff Avenue from Valentia Street to Trenton Way, as traffic is reduced to one lane while crews perform bridge work over Cherry Creek.
The Cherry Creek Trail is currently open under Iliff Avenue but there will be intermittent closures as crews perform bridge work, requiring cyclists to dismount. During closures, trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side.
Road excavation and removals are near completion on the north side of Iliff Avenue at the Emporia Street intersection. Emporia Street will reopen to two-way traffic on Monday, May 23.
Underground drainage installation across Dayton Street is near completion. Crews will reopen Dayton Street to two-way traffic on Monday, May 23.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress. During construction there will be no closure of the High Line Canal Trail, but flaggers will be in place to assist trail users safely through the construction zone.
Travel Impacts
- 7 a.m., through 5 p.m., Wednesday, May 25:
- Intermittent shifting single lane closures on Iliff Avenue from Wabash Street to Cherry Creek Drive.
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic and Transit Impacts for the Week of May 15
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Crews have closed northbound access on Cherry Creek Drive from Iliff Avenue to perform underground drainage installation. Motorists are advised to use an alternate route.
Motorists can also expect delays on westbound Iliff Avenue from Valentia Street to Trenton Way, as traffic is reduced to one lane while crews perform bridge work over Cherry Creek.
To safely install underground drainage across Dayton Street, crews have currently restricted access on Dayton Street at Iliff Avenue to one-way northbound access only. Crews will reopen Dayton Street on Friday, May 20.
The Cherry Creek Trail is currently open under Iliff Avenue but there will be intermittent closures as crews perform bridge work, requiring cyclists to dismount. During closures, trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side.
Road excavation and removals continue on the north side of Iliff Avenue at the Emporia Street intersection. Emporia Street will have extended lane and sidewalk closures while crews perform underground drainage installation.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress. During construction there will be no closure of the High Line Canal Trail, but flaggers will be in place to assist trail users safely through the construction zone. To shift traffic and open work areas, crews will conduct shifting lane closures on Iliff Avenue from Wabash Street to Cherry Creek Drive on Saturday, May 21. Motorists should expect delays.
Travel Impacts:
- 7 a.m., through 5 p.m., Monday, May 15, through Friday, May 20:
- Intermittent shifting single lane closures on Iliff Avenue from Wabash Street to Cherry Creek Drive.
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic and Transit Impacts for the Week of May 8
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Motorists can expect delays on westbound Iliff Avenue from Valentia Street to Trenton Way, as traffic is reduced to one lane while crews perform bridge work over Cherry Creek.
The Cherry Creek Trail is currently open under Iliff Avenue but there will be intermittent closures as crews perform bridge work, requiring cyclists to dismount. During closures, trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side.
Crews continue signal removal for future caisson installation at Trenton Way and Iliff Avenue, requiring intermittent dedicated right lane impacts and sidewalk closures with pedestrian detours.
Road excavation and removals continue on the north side of Iliff Avenue at the Emporia Street intersection. Emporia Street will have extended lane and sidewalk closures while crews perform underground drainage installation.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress. During construction there will be no closure of the High Line Canal Trail, but flaggers will be in place to assist trail users safely through the construction zone.
Travel Impacts:
- 7 a.m., through 5 p.m., Monday, May 9, through Friday, May 13:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Trenton Way and Iliff Avenue.
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic and Transit Impacts for the Week of April May 1
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Crews will begin signal removal for future caisson installation at Trenton Way and Iliff Avenue this week. Operations will require intermittent dedicated right lane impacts and sidewalk closures require pedestrian detours.
Road excavation and removals continue on the north side of Iliff Avenue at the Emporia Street intersection. Emporia Street will have extended lane and sidewalk closures while crews perform underground drainage installation.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements progress. During construction there will be no closure of the High Line Canal Trail, but flaggers will be in place to assist trail users safely through the construction zone.
The Cherry Creek Trail is currently open under Iliff Avenue but there will be intermittent closures as crews perform bridge work. Trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side.
Bridge work over Cherry Creek will also require crews to restrict westbound Iliff Avenue traffic to one lane from Valentia Street to Trenton Way. Motorists should expect delays.
Environmental removals will take place throughout the corridor in the coming weeks to open future work areas for roadway widening.?
Transit Impacts
- 7 a.m., through 5 p.m., Monday, May 2, through Friday, May 6:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Trenton Way and Iliff Avenue.
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic and Transit Impacts for the Week of April 24
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. A two-week closure of the Cherry Creek Trail will start on Monday, April 25, to perform bridge work. During the closure, trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side.
Bridge work over Cherry Creek will also require crews to restrict westbound Iliff Avenue traffic to one lane from Valentia Street to Trenton Way. Motorists should expect delays.
Signal removal for future caisson installation at Trenton Way at Iliff Avenue has started, requiring intermittent dedicated right lane impacts and sidewalk closures with pedestrian detours.
In the coming weeks, various trees will be removed along Iliff Avenue to open future work areas for roadway widening.
Road excavation and removals continue on the north side of the Iliff Avenue and Emporia Street intersection. Crews are performing underground drainage installation, causing extended lane and sidewalk closures.
Work on the High Line Canal Trail continues with bike trail reconstruction, bridge rehabilitation and environmental improvements. The trail will remain open, as flaggers are available to assist trail users safely through the construction zone.
Travel Impacts
- 7 a.m., through 5 p.m., Monday, April 25, through Friday, April 29:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Trenton Way and Iliff Avenue.
Transit Impacts
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic and Transit Impacts for the Week of April 17
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. A two-week closure of the Cherry Creek Trail will start on April 25 to perform bridge work. During the closure, trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side.
Bridge work over Cherry Creek will also require crews to restrict westbound Iliff Avenue traffic to one lane from Wabash Street and Cherry Creek Drive starting April 25. Motorists should expect delays.
Signal removal for future caisson installation at Trenton Way at Iliff Avenue will start on Monday, April 18, requiring intermittent dedicated right lane impacts and sidewalk closures with pedestrian detours.
In the coming weeks, various trees will be removed along Iliff Avenue to open future work areas for roadway widening.
Road excavation and removals continue on the north side of the Iliff Avenue and Emporia Street intersection. Crews are performing underground drainage installation, causing extended lane and sidewalk closures.
Work on the High Line Canal Trail continues with bike trail reconstruction, bridge rehabilitation and environmental improvements. The trail will remain open, as flaggers are available to assist trail users safely through the construction zone.
The Cherry Creek Trail under Iliff Avenue is currently open. However, trail users will encounter temporary closures and flagging operations as construction continues. During the intermittent closures, cyclists are required to dismount, and trail users will use the detour in place.
Travel Impacts
- 7 a.m., through 5 p.m., Monday, April 18, through Friday, April 22:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Trenton Way and Iliff Avenue.
Transit Impacts
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic and Transit Impacts for the Week of April 10
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Crews will begin signal removal for future caisson installation at Trenton Way at Iliff Avenue starting Monday, April 11. Operations will require intermittent dedicated right lane impacts and sidewalk closures that require pedestrian detours.
In the coming weeks, various trees will be removed along Iliff Avenue to open future work areas for roadway widening.
To safely install underground drainage, crews have restricted access on Dayton Street at Iliff Avenue to one-way northbound access only. Work will continue through mid-April. Motorists are advised to use Jewell Circle to exit the neighborhood to Parker Road.
To continue bridge work over Cherry Creek, crews will temporarily restrict westbound Iliff Avenue traffic to one lane from Valentia Street to Cherry Creek Drive in mid-April. Motorists should expect delays.
Road excavation and removals continue on the north side of the Iliff Avenue and Emporia Street intersection. Crews are performing underground drainage installation, causing extended lane and sidewalk closures.
Work on the High Line Canal Trail continues with bike trail reconstruction, bridge rehabilitation and environmental improvements. The trail will remain open, as flaggers are available to assist trail users safely through the construction zone.
The Cherry Creek Trail has reopened under Iliff Avenue. However, trail users will encounter temporary closures and flagging operations as construction continues. During the intermittent closures, cyclists are required to dismount, and trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side.
Travel Impacts
- 7 a.m., through 5 p.m., Monday, April 11, through Friday, April 15:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Trenton Way and Iliff Avenue.
Transit Impacts
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic and Transit Impacts for the Week of April 3
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. In the coming weeks, various trees will be removed along Iliff Avenue to open future work areas for roadway widening.
Crews have begun signal removal for future caisson installation at Wabash Street at Iliff Avenue. Operations require intermittent dedicated right lane impacts and a pedestrian detour due to sidewalk closures.
To safely install underground drainage, crews have restricted access on Dayton Street at Iliff Avenue to one-way northbound access only. Work will continue through mid-April. Motorists are advised to use Jewell Circle to exit the neighborhood to Parker Road.
To continue bridge work over Cherry Creek, crews will temporarily restrict westbound Iliff Avenue traffic to one lane from Valentia Street to Cherry Creek Drive in mid-April. Motorists should expect delays.
Road excavation and removals continue on the north side of the Iliff Avenue and Emporia Street intersection. Crews are performing underground drainage installation, causing extended lane and sidewalk closures.
Work on the High Line Canal Trail continues with bike trail reconstruction, bridge rehabilitation and environmental improvements. The trail will remain open, as flaggers are available to assist trail users safely through the construction zone.
The Cherry Creek Trail has reopened under Iliff Avenue. However, trail users will encounter temporary closures and flagging operations as construction continues. During the intermittent closures, cyclists are required to dismount, and trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side.
Travel Impacts
- 7 a.m., through 5 p.m., Monday, April 4, through Friday, April 8:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Wabash Street and Iliff Avenue.
Transit Impacts
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic and Transit Impacts for the Week of March 28
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Crews have begun signal removal for future caisson installation at Wabash Street at Iliff Avenue. Operations will require intermittent dedicated right lane impacts and sidewalk closures require pedestrian detours.
To safely install underground drainage across Dayton Street, crews have restricted access on Dayton Street at Iliff Avenue to one-way northbound access only. Operations will continue through early April. Motorists are advised to use Jewell Circle to exit the neighborhood to Parker Road.
To continue bridge work over Cherry Creek, crews will temporarily restrict westbound Iliff Avenue traffic to one lane from Valentia Street to Cherry Creek Drive. Motorists should expect delays.
Road excavation and removals continue on the north side of the Iliff Avenue and Emporia Street intersection. Crews are performing underground drainage installation, causing extended lane and sidewalk closures.
Work on the High Line Canal Trail continues with bike trail reconstruction, bridge rehabilitation and environmental improvements. The trail will remain open, as flaggers are available to assist trail users safely through the construction zone.
The Cherry Creek Trail has reopened under Iliff Avenue. However, trail users will encounter temporary closures and flagging operations, which will requiring cyclists to dismount, as construction continues. During the intermittent closures, trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side.
Travel Impacts:
- 7 a.m., through 5 p.m., Monday, March 28, through Friday, April 1:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Wabash Street and Iliff Avenue.
- Ongoing throughout the week:
- Extended single-lane closure on westbound Iliff Avenue between Valentia Street and Cherry Creek Drive.
Transit Impacts:
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed:
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of March 20
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. To safely install underground drainage across Dayton Street, crews have restricted access on Dayton Street at Iliff Avenue to one-way northbound access only. Operations began March 14and will continue approximately two weeks. Motorists are advised to use Jewell Circle to exit the neighborhood to Parker Road.
Crews have begun signal removal for future caisson installation at Wabash Street at Iliff Avenue. Operations will require intermittent dedicated right lane impacts and sidewalk closures require pedestrian detours.
To continue bridge work over Cherry Creek, crews will temporarily restrict westbound Iliff Avenue traffic to one lane from Valentia Street and Cherry Creek Drive. Motorists should expect delays.
Crews have begun signal removal for future caisson installation at Wabash Street at Iliff Avenue. Operations will require intermittent dedicated right lane impacts and sidewalk closures require pedestrian detours.
Road excavation and removals continue on the north side of Iliff Avenue at Emporia Street intersection. Crews are performing underground drainage installation, causing extended lane and sidewalk closures.
Work on the High Line Canal Trail continues with bike trail reconstruction, bridge rehabilitation and environmental improvements. During construction there will be no closure of the trail, and flaggers are available to assist trail users safely through the construction zone.
The Cherry Creek Trail has reopened under Iliff Avenue. As construction continues temporary closures and flagging operations requiring cyclists to dismount will be required intermittently. During the intermittent closures, trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side.
Travel Impacts
- 7 a.m., through 5 p.m., Monday, March 21, through Friday, March 25:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Wabash Street and Iliff Avenue.
- Ongoing throughout the week:
- Extended single-lane closure on westbound Iliff Avenue between Valentia Street and Cherry Creek Drive.
Transit Impacts
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of March 13
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. To safely install underground drainage across Dayton, crews will restrict access at Dayton Street on Iliff Avenue on Monday, March 14. There will be one-way northbound access only. Work will last two weeks. Motorists will be directed to use Jewell Circle to exit the neighborhood to Parker Road.
Crews have started signal removal for future caisson installation at Yosemite and Wabash streets at Iliff Avenue. Operations will require intermittent impact to the right lane and sidewalk closures, which require pedestrian detours.
To continue bridge work over Cherry Creek, crews have temporarily restricted westbound Iliff Avenue to one lane between Valentia Street and Cherry Creek Drive. Motorists should expect delays.
Road excavation and removals continue on the north side of Iliff Avenue at Emporia Street intersection. Crews are performing underground drainage installation, causing extended lane and sidewalk closures.
Work on the High Line Canal Trail continues with bike trail reconstruction, bridge rehabilitation and environmental improvements. During construction there will be no closure of the trail, and flaggers are available to assist trail users safely through the construction zone.
Work on the Cherry Creek Trail continues. A full closure of the trail under Iliff Avenue is in effect. The closure will last three more months. A detour is in place. Trail users are directed to cross Iliff Avenue at the signalized crosswalk at Trenton Way and then back along Iliff Avenue to rejoin the trail on the other side.
Travel Impacts:
- 7 a.m., through 5 p.m., Monday, March 14, through Friday, March 18:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Yosemite Street and Iliff Avenue.
- Intermittent dedicated right turn and sidewalk closures requiring detours at Wabash Street and Iliff Avenue.
- Ongoing throughout the week:
- Extended single-lane closure on westbound Iliff Avenue between Valentia Street and Cherry Creek Drive.
Transit Impacts:
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed:
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of March 6
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. To continue bridge work over Cherry Creek, crews have temporarily restricted westbound Iliff Avenue to one lane between Valentia Street and Cherry Creek Drive. Motorists should expect delays.
To safely install underground drainage across Dayton, crews will restrict access at Dayton Street on Iliff Avenue starting Wednesday, March 9. There will be one-way northbound access only. Work will last two weeks. Motorists will be directed to use Jewell Circle to exit the neighborhood to Parker Road.
Road excavation and removals continue on the north side of Iliff Avenue at Emporia Street intersection. Crews are performing underground drainage installation, causing extended lane and sidewalk closures.
Crews have begun signal removal for future caisson installation at Yosemite Street and Iliff. Work requires intermittent right lane and sidewalk closures. A detour is in place for motorists and pedestrians.
Work on the High Line Canal Trail continues with bike trail reconstruction, bridge rehabilitation and environmental improvements. During construction there will be no closure of the trail, and flaggers are available to assist trail users safely through the construction zone.
Work on the Cherry Creek Trail continues. A full closure of the trail under Iliff Avenue is in effect. The closure will last three more months. A detour is in place. Trail users are directed to cross Iliff Avenue at the signalized crosswalk at Trenton Way and then back along Iliff Avenue to rejoin the trail on the other side.
Travel Impacts
- 7 a.m., through 5 p.m., Monday, March 7, through Friday, March 11:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Yosemite Street and Iliff Avenue.
- Ongoing throughout the week:
- Extended single-lane closure on westbound Iliff Avenue between Valentia Street and Cherry Creek Drive.
Transit Impacts
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Feb. 28
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. To continue bridge work over Cherry Creek, crews will temporarily reduce westbound Iliff Avenue to one lane from Valentia Street to Cherry Creek Drive starting Tuesday, March 1. Motorists should expect delays.
To safely install underground drainage across Dayton Street, crews will restrict access at Dayton Street on Iliff Avenue. There will be one-way northbound access only. Work will start March 9 and last two weeks. Motorists will be directed to use Jewell Circle to exit the neighborhood to Parker Road.
Road excavation and removals continue on the north side of Iliff at the Emporia Street intersection. Crews are performing underground drainage installation, causing extended lane and sidewalk closures.
Crews have begun signal removal for future caisson installation at Yosemite Street and Iliff. Work requires intermittent right lane and sidewalk closures. A detour is in place for motorists and pedestrians.
Work on the High Line Canal Trail continues with bike trail reconstruction, bridge rehabilitation and environmental improvements. During construction there will be no closure of the trail, and flaggers are available to assist trail users safely through the construction zone.
Work on the Cherry Creek Trail continues. A full closure of the trail under Iliff Avenue is in effect. The closure will last for about four months. A detour is in place for trail users, who will now cross Iliff Avenue at the signalized crosswalk at Trenton Way and then back along Iliff to rejoin the trail on the other side.
Travel Impacts:
- 7 a.m., through 5 p.m., Monday, Feb. 28, through Friday, March 4:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Yosemite Street and Iliff Avenue.
- Beginning Tuesday, March 1:
- Extended single-lane closure on westbound Iliff Avenue between Valentia Street and Cherry Creek Drive.
Transit Impacts:
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Feb. 20
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. To continue bridge work over Cherry Creek, crews will temporarily reduce westbound Iliff Avenue to one lane from Valentia Street and Cherry Creek Drive starting March 1. Motorists should expect delays.
To safely install underground drainage across Dayton Street, crews will restrict access at Dayton Street on Iliff Avenue. There will be one-way northbound access only. Work will start March 8and last two weeks. Motorists will be directed to use Jewell Circle to exit the neighborhood to Parker Road.
Road excavation and removals continue on the north side of Iliff at the Emporia Street intersection. Crews are performing underground drainage installation, causing extended lane and sidewalk closures.
Crews have begun signal removal for future caisson installation at Yosemite Street and Iliff. Work requires intermittent right lane and sidewalk closures. A detour is in place for motorists and pedestrians.
Work on the High Line Canal Trail continues with bike trail reconstruction, bridge rehabilitation and environmental improvements. During construction there will be no closure of the trail, and flaggers are available to assist trail users safely through the construction zone.
Work on the Cherry Creek Trail continues. A full closure of the trail under Iliff Avenue is in effect. The closure will last for about four months. A detour is in place for trail users, who will now cross Iliff Avenue at the signalized crosswalk at Trenton Way and then back along Iliff to rejoin the trail on the other side.
Travel Impacts:
- 7 a.m., through 5 p.m., Monday, Feb. 21 through Friday, Feb. 25:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Yosemite Street and Iliff Avenue.
Transit Impacts:
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed:
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Feb. 13
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Starting on Feb. 21, crews will restrict access to Dayton Street at Iliff Avenue to install underground drainage. Work is expected to last two weeks. Motorists will be advised to use Jewell Circle to exit the neighborhood and access Parker Road.
Road excavation and removals continue on the north side of Iliff Avenue at the Emporia Street intersection. Crews are performing underground drainage installation, causing extended lane and sidewalk closures.
Crews have begun signal removal for future caisson installation at Yosemite Street and Iliff Avenue. Work requires intermittent right lane and sidewalk closures. A detour is in place for motorists and pedestrians.
Work on the High Line Canal Trail continues with bike trail reconstruction, bridge rehabilitation and environmental improvements. During construction there will be no closure of the trail, and flaggers are available to assist trail users safely through the construction zone.
Work on the Cherry Creek Trail has begun. A full closure of the trail under Iliff Avenue is in effect. The closure will last for about four months. A detour is in place for trail users, who will now cross Iliff Avenue at the signalized crosswalk at Trenton Way and then back along Iliff Avenue to rejoin the trail on the other side.
Travel Impacts:
- 7 a.m. to 5 p.m., Monday, Feb. 14, through Friday, Feb. 18:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Yosemite Street and Iliff Avenue.
Transit Impacts:
- The RTD bus stop at the northwest corner of Parker Road and Iliff Avenue is currently closed. RTD stops along Iliff Avenue between Parker Road and Yosemite Street are operational.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed:
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Feb. 6
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals continue on the north side of Iliff Avenue at the Emporia Street intersection. Crews are performing underground drainage installation, causing extended lane and sidewalk closures.
Crews have begun signal removal for future caisson installation at Yosemite Street and Iliff Avenue. Work requires intermittent right lane and sidewalk closures. A detour is in place for motorists and pedestrians.
Work on the High Line Canal Trail continues with bike trail reconstruction, bridge rehabilitation and environmental improvements. The work includes pile driving operations that is noticeable to nearby residents. During construction there will be no closure of the trail, and flaggers are available to assist trail users safely through the construction zone.
Work on the Cherry Creek Trail has begun. A full closure of the trail under Iliff Avenue is in effect. The closure will last for about four months. A detour is in place for trail users, who will now cross Iliff Avenue at the signalized crosswalk at Trenton Way and then back along Iliff Avenue to rejoin the trail on the other side.
In late February, crews will restrict access to Dayton Street at Iliff Avenue to install underground drainage. Work is expected to last two weeks. Motorists will be advised to use Jewell Circle to exit the neighborhood and access Parker Road.
Travel Impacts:
- 7 a.m. to 5 p.m., Monday, Feb. 7, through Friday, Feb. 11:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Yosemite Street and Iliff Avenue.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic Impacts for the Week of Jan. 30
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals continue on the north side of Iliff Avenue at the Emporia Street intersection. Crews are performing underground drainage installation, causing extended lane and sidewalk closures.
Crews will begin signal removal for future caisson installation at Yosemite Street and Iliff Avenue from 7 a.m. to 5 p.m. daily next week. Starting Monday, Jan. 31, work will require intermittent right lane and sidewalk closures. A detour is in place for motorists and pedestrians.
Work on the High Line Canal Trail continues with bike trail reconstruction, bridge rehabilitation and environmental improvements. The work includes pile driving operations that is noticeable to nearby residents. During construction there will be no closure of the trail, and flaggers are available to assist trail users safely through the construction zone.
Work on the Cherry Creek Trail has begun. A full closure of the trail under Iliff Avenue is in effect. The closure will last for about four months. A detour is in place for trail users, who will now cross Iliff Avenue at the signalized crosswalk at Trenton Way and then back along Iliff Avenue to rejoin the trail on the other side.
In mid-February, crews will restrict access to Dayton Street at Iliff Avenue to install underground drainage. Work is expected to last two weeks. Motorists will be advised to use Jewell Circle to exit the neighborhood and access Parker Road.
Travel Impacts
- 7 a.m. to 5 p.m., Monday, Jan. 31, through Friday, Feb. 4:
- Intermittent dedicated right turn and sidewalk closures requiring detours at Yosemite Street and Iliff Avenue.
Access to businesses and transit stops will be maintained throughout the corridor during construction.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic Impacts for the Week of Jan. 24
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals continue on the north side of Iliff Avenue at the Emporia Street intersection. There will be extended lane and sidewalk closures at Emporia Street while crews perform underground drainage installation.
Crews will also restrict access to Dayton Street at Iliff Avenue to install underground drainage. Work will is expected to last two weeks. Motorists are advised to use Jewell Circle to exit the neighborhood and access Parker Road.
Work on the High Line Canal Trail continues as bike trail reconstruction, bridge rehabilitation and environmental improvements. Next week, work will require approximately three days of pile driving operations that will be noticeable to nearby residents. During construction there will be no closure of the High Line Canal Trail, but flaggers will be in place to assist trail users safely through the construction zone.
Cherry Creek Trail work has begun and will continue through Spring 2022. During construction a full closure of the Cherry Creek Trail under Iliff Avenue will be in effect starting early February and continue for approximately four months. Trail users are directed to detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side.
Travel Impacts
No traffic impacts.
Businesses remain accessible throughout the Iliff Avenue corridor during construction. Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures.
Large equipment is currently in operation on-site, please be aware and maintain a safe distance from construction activities. All work is weather-dependent and subject to change.
Traffic Impacts for the Week of Jan. 16
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals continue on the north side of Iliff Avenue at the Emporia Street intersection. There will be extended lane and sidewalk closures at Emporia Street while crews perform underground drainage installation.
Crews will also restrict access to Dayton Street at Iliff Avenue to install underground drainage. Work will begin next week and last two weeks. Motorists are advised to use Jewell Circle to exit the neighborhood and access Parker Road.
Work on the High Line Canal Trail continues for bike trail reconstruction, bridge rehabilitation and environmental improvements. Next week, there will be three days of pile driving operations that will be noticeable to nearby residents. During construction there will be no closure of the High Line Canal Trail, but flaggers are in place to assist trail users through the construction zone.
The Cherry Creek Trail under Iliff Avenue is closed for the next four months. Trail users are directed to detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side.
Travel Impacts:
- 7 a.m. until 5 p.m., Monday, Jan. 17:
- Eastbound Iliff Avenue right lane closures from Yosemite Street to Parker Road.
- 8 a.m. until 3 p.m., Tuesday, Jan. 18:
- Westbound Iliff Avenue left lane and median closures from Parker Road to Yosemite Street.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic Impacts for the Week of Jan. 10
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals continue on the north side of Iliff Avenue at the Emporia Street intersection. Emporia Street has extended lane and sidewalk closures while crews perform underground drainage installation.
The Cherry Creek Trail under Iliff Avenue is closed for the next four months. Trail users are directed to detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side.
Travel Impacts
- Monday, Jan. 10 through Friday, Jan. 14
- Lane and sidewalk closures at Emporia Street while crews install underground drainage.
- Full closure of the Cherry Creek Trail under Iliff Avenue. Trail users will follow a detour.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures.
STAY INFORMED:
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic Impacts for the Week of Jan. 1
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Road excavation and removals will continue on the north side of Iliff Avenue beginning with the Emporia Street intersection. Starting Jan. 4, Emporia Street will have extended lane and sidewalk closures while crews perform underground drainage installation.
A full closure of the Cherry Creek Trail under Iliff Avenue will be in effect starting Jan. 4 and continue about four months. Trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side of Illif Avenue.
Travel Impacts
Saturday, Jan. 1 through Friday, Jan. 7:
Tuesday, Jan. 4 through Friday, Jan. 7
- Lane and sidewalk closures at Emporia Street while crews install underground drainage.
- Full closure of the Cherry Creek Trail under Iliff Avenue. Trail users will follow a detour.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures.
STAY INFORMED:
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic Impacts for the Week of Dec. 25
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Crews have shifted traffic between Wabash to Yosemite streets to open work areas for future widening. Road excavation and removals continue on the north side of Iliff Avenue beginning with the Emporia Street intersection. In the coming weeks, Emporia Street will have extended lane and sidewalk closures while crews perform underground drainage installation.
Work on the High Line Canal Trail has started. Construction include bike trail reconstruction, bridge rehabilitation and environmental improvements. Pile driving operations, which will be noticeable to nearby residents, is underway. During construction there will be no closure of the High Line Canal Trail.
A full closure of the Cherry Creek Trail under Iliff Avenue will be in effect starting Jan. 4 and continue about four months. Trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side of Illif Avenue.
Travel Impacts
Saturday, December 25:
- Monday, Dec. 27 through Wednesday, Dec. 29
- Daytime intermittent lane closures on westbound Iliff Avenue at Dayton Way
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures.
STAY INFORMED:
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic Impacts for the Week of Dec. 18
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Crews will shift traffic between Wabash Street to Yosemite Street to open work areas for future widening. Traffic shift operations are scheduled for Saturday, Dec. 18, morning. Although access through the corridor will be maintained during traffic shift operations, intermittent lane closures will take place as needed. Traffic is advised to take an alternate route.
Road excavation and removals will occur on north side of Iliff Avenue beginning with the Emporia Street intersection. In the coming weeks, Emporia Street will have extended lane and sidewalk closures while crews perform underground drainage installation.
Work on the High Line Canal Trail has started. Construction activities include bike trail reconstruction, bridge rehabilitation and environmental improvements. Work will require approximately a week of pile driving operations that will be noticeable to nearby residents. During construction there will be no closure of the High Line Canal Trail, but flaggers will be in place to assist trail users safely through the construction zone.
Cherry Creek Trail work will begin in early January and will continue through Spring 2022. During construction a full closure of the Cherry Creek Trail under Iliff Avenue will be in effect starting Jan. 4 and continue for about four months. Trail users will detour along Iliff Avenue to the signalized crosswalk at Trenton Way and back along Iliff Avenue to join Cherry Creek Trail on the other side of Illif Avenue. View the detour map.
Roadway maintenance operations will also continue through the end of 2021. Crews will conduct intermittent short-term lanes closures for pothole repairs between Quebec Street and Parker Road.
Travel Impacts
Saturday, December 18:
- 7 a.m. traffic shift operations will begin. Traffic is advised to take an alternate route.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. All work is weather-dependent and subject to change. Access to transit stops will be maintained throughout construction.
STAY INFORMED:
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Traffic Impacts for the Week of Dec. 12
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Crews have shifted traffic between Parker Road (CO83) and Wabash Street to open work areas for future widening. Road excavation and removals will be taking place on the north side of Iliff Avenue beginning with the Emporia Street intersection. In the coming weeks, Emporia Street will have extended lane and sidewalk closures while crews perform underground drainage installation.
Work has started on the High Line Canal Trail. Construction activities include bike trail reconstruction, bridge rehabilitation and environmental improvements. Pile driving operations that will be noticeable to nearby residents is underway. During construction there will be no closure of the High Line Canal Trail, but flaggers will be in place to assist trail users safely through the construction zone.
Roadway maintenance operations will continue through the end of 2021. Crews will conduct intermittent short-term lane closures throughout the corridor to perform pothole repairs between Quebec Street and Parker Road.
Traffic Impacts
No impact to motorists or pedestrians next week.
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project is also being completed in the area requiring various lane closures. All work is weather-dependent and subject to change. Access to transit stops will be maintained throughout construction.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts Starting Dec. 4
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Crews will shift traffic between Parker Road (CO83) and Wabash Street to open work areas for future widening. The traffic shift will take place at 7 a.m. Saturday, Dec. 4. Access through the corridor will be maintained during the traffic shift, but intermittent lane closures will take place as needed. Motorists are advised to take an alternate route.
The traffic switch will allow road excavation and removals to take place on the north side of Iliff Avenue starting with the Emporia Street intersection. Emporia Street will have extended lane and sidewalk closures next week while crews perform underground drainage installation.
Work on the High Line Canal Trail has begun. Construction activities include bike trail reconstruction, bridge rehabilitation and environmental improvements. Work will require approximately a week of pile driving operations that will be noticeable to nearby residents. There will be no closure of the High Line Canal Trail, and flaggers will be in place to assist trail users through the construction zone.
Roadway maintenance operations will also continue through the end of 2021. Crews will conduct intermittent short-term lanes closures for pothole repairs between Quebec Street and Parker Road.
Travel Impacts
- Daytime Saturday, Dec. 4:
- Intermittent lane closures on Iliff Avenue from Parker Road to Wabash Street
- Monday, Dec. 6 through Friday, Dec. 10:
- Extended lane and sidewalk closures on Emporia Street at Iliff Avenue
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project, is also being completed in the area requiring various lane closures. All work is weather-dependent and subject to change. Access to transit stops will be maintained throughout construction.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Nov. 29
Arapahoe County Public Works and Concrete Express Inc. continue corridor improvements on Iliff Avenue. Crews will continue work between Yosemite and Wabash streets to prepare to shift traffic to open work areas for future widening. Sidewalk removals on Emporia Street will also take place next week.
Utility work will progress, requiring single right lane closure intermittently throughout the work zone.
Work on the High Line Canal Trail will start in December. Work includes bike trail reconstruction, bridge rehabilitation and environmental improvements. Work will require a week of pile driving operations in early December that will be noticeable to nearby residents. During construction, the High Line Canal Trail will remain open, and flaggers will help trail users get through the construction zone safely.
Roadway maintenance operations will also continue through the end of 2021. Crews will conduct intermittent short-term lanes closures for pothole repairs between Quebec Street and Parker Road.
Travel Impacts
- 8:30 a.m. through 3:30 p.m., Monday, Nov. 29 through Friday, Dec. 3:
- Intermittent right lane closures on Iliff Avenue from Parker Road to Quebec Street
Please follow pedestrian signage and use crosswalks or follow the directions of project flaggers and/or team members to safely cross the work zones. Other third-party utility work unaffiliated with this project, is also being completed in the area requiring various lane closures. All work is weather-dependent and subject to change. Access to transit stops will be maintained throughout construction.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Nov. 22
Arapahoe County Public Works and Development and Concrete Express Inc. continue corridor improvements on Iliff Avenue. As part of this improvement project, truck hauling operations will take place next week during the day as crews continue to clear debris from demolishing two dilapidated buildings at the northwest corner of Parker Road and Iliff Avenue. Daytime truck haul operations will resume on Nov. 29 as part of the demolition.
Crews will continue to perform existing roadway and median removals between Yosemite and Wabash streets and sidewalk removals between Emporia Street and Dayton Way. To safely remove the existing median to open the roadway for future widening, there will be daytime single-lane closures.
Roadway maintenance operations will begin throughout the corridor and continue intermittently through November. Crews will conduct intermittent short-term lane closures to perform pothole repairs between Quebec Street and Parker Road.
Travel Impacts
- 8:30 a.m. through 3:30 p.m., Monday, Nov. 22, through Friday, Nov. 24:
- Daytime intermittent single lane closures on westbound Iliff Avenue from Parker Road (CO 83) to Wabash Street
- Daytime intermittent single lane closures on eastbound Iliff Avenue from Wabash Street to Parker Road (CO 83)
- Due to Thanksgiving Holiday, no work will take place between 3:30 p.m. Nov. 24 through 8:30 a.m. Nov. 29.
All work is weather-dependent and subject to change. Other third party utility work is also being completed in the area, unaffiliated with this project, requiring lane closures.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Nov. 15
Arapahoe County Public Works and Development and Concrete Express Inc. continue corridor improvements on Iliff Avenue. As part of this improvement project, truck hauling operations will take place next week during the day as crews continue to clear debris from demolishing two dilapidated buildings at the northwest corner of Parker Road and Iliff Avenue.
Crews will also continue to perform existing roadway, median and sidewalk removals, between Yosemite and Wabash streets. To safely remove the existing median to open the roadway for future widening, crews will conduct daytime single lane closures.
Roadway maintenance operations will begin throughout the corridor and continue intermittently through November. Crews will conduct intermittent short-term lane closures to perform pothole repairs between Quebec Street and Parker Road.
Travel Impacts
- 8:30 a.m. through 3:30 p.m., Monday, Nov. 15, through Friday, Nov. 19:
- Daytime intermittent single lane closures on westbound Iliff Avenue from Parker Road (CO 83) to Wabash Street
- Daytime intermittent single lane closures on eastbound Iliff Avenue from Wabash Street to Parker Road (CO 83)
All work is weather-dependent and subject to change. Other third party utility work is also being completed in the area, unaffiliated with this project, requiring various lane closures.
In the future, travelers can expect daytime and nighttime traffic impacts. Intermittent daytime and nighttime lane closures should be expected. Minor impacts to bicycle and pedestrian access will be required. Access to transit stops will be maintained throughout construction.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Nov. 8
Arapahoe County Public Works and Development and Concrete Express Inc. continue corridor improvements on Iliff Avenue. As part of this improvement project, crews demolished two dilapidated buildings at the northwest corner of Parker Road and Iliff Avenue. Truck hauling operations will take place next week during the day as part of the demolition.
Crews will continue to perform existing roadway, median and sidewalk removals, between Yosemite and Wabash streets. To safely remove the existing median to open the roadway for future widening, crews will conduct daytime single lane closures.
Roadway maintenance operations will begin throughout the corridor and continue intermittently through November. Crews will conduct intermittent short-term lane closures to perform pothole repairs between Quebec Street and Parker Road.
Travel Impacts
- 8:30 a.m. through 3:30 p.m., Monday, Nov. 8, through Friday, Nov. 12:
- Daytime intermittent single lane closures on westbound Iliff Avenue from Parker Road (CO 83) to Wabash Street
- Daytime intermittent single lane closures on eastbound Iliff Avenue from Wabash Street to Parker Road (CO 83)
All work is weather-dependent and subject to change. Other third party utility work is also being completed in the area, unaffiliated with this project, requiring various lane closures.
In the future, travelers can expect daytime and nighttime traffic impacts. Intermittent daytime and nighttime lane closures should be expected. Minor impacts to bicycle and pedestrian access will be required. Access to transit stops will be maintained throughout construction.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Oct. 31
Arapahoe County Public Works continues improvements, along with contractor partner Concrete Express Inc., on the Iliff Avenue corridor. Crews continue to perform existing roadway, median and sidewalk removals, between Yosemite and Wabash streets. To safely remove the existing median to open the roadway for future widening, crews will conduct daytime single lane closures.
Crews will also continue to demolish two dilapidated buildings at the northwest corner of Parker Road and Iliff Avenue. Daytime truck haul operations will take place as part of the demolition at Parker Road and Iliff Avenue. Demolition will not impact surrounding businesses, and the work zone is restricted to construction crews only. Crews will also perform pothole repairs between Quebec Street and Parker Road through November.
Travel Impacts
- 8:30 a.m. through 3:30 p.m., Monday, November 1 through Friday, November 5:
- Daytime intermittent single lane closures on westbound Iliff Avenue from Parker Road (CO 83) to Wabash Street
- Daytime intermittent single lane closures on eastbound Iliff Avenue from Wabash Street to Parker Road (CO 83)
All work is weather-dependent and subject to change. Other third party utility work is also being completed in the area, unaffiliated with this project, requiring various lane closures.
In the future, travelers can expect daytime and nighttime traffic impacts. Intermittent daytime and nighttime lane closures should be expected. Minor impacts to bicycle and pedestrian access will be required. Access to transit stops will be maintained throughout construction.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Oct. 25
Arapahoe County Public Works and Development continues improvements, along with contractor partner Concrete Express Inc., on the Iliff Avenue corridor.
As part of this corridor improvement project, crews will demolish two dilapidated buildings next week at the northwest corner of Parker Road and Iliff Avenue. Truck hauling operations will take place as part of the demolition at Parker Road and Iliff Avenue. Demolition activities will not impact surrounding businesses.
Crews will also continue to perform existing roadway, median and sidewalk removals, between Yosemite and Wabash streets. To safely remove the existing median to open the roadway for future widening, crews will conduct daytime single lane closures.
- 8:30 a.m. through 3:30 p.m., Monday, Oct. 25, through Friday, Oct. 29:
- Daytime intermittent single lane closures on westbound Iliff Avenue from Parker Road (CO 83) to Wabash Street
- Daytime intermittent single lane closures on eastbound Iliff Avenue from Wabash Street to Parker Road (CO 83)
All work is weather-dependent and subject to change. Other third party utility work is also being completed in the area, unaffiliated with this project, requiring various lane closures.
In the future, travelers can expect daytime and nighttime traffic impacts. Intermittent daytime and nighttime lane closures should be expected. Minor impacts to bicycle and pedestrian access will be required. Access to transit stops will be maintained throughout construction.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Oct. 18
Beginning Oct. 18, crews will begin paving temporary detour pavement in preparation to shift traffic and open work areas for new roadway construction. Paving and barrier removal operations will require single lane daytime closures on Parker Road at Iliff Avenue. Crews will also continue to perform existing roadway, median and sidewalk removals, between Yosemite Street and Wabash Street. To safely remove the existing median to open the roadway for future widening, crews will conduct daytime single lane closures.
As part of the liff Avenue corridor improvements, crews will demolish two dilapidated buildings at the northwest corner of Parker Road and Iliff Avenue later this month. Demolition activities will not impact surrounding businesses.
- 8:30 a.m. through 3:30 p.m., Monday, Oct. 18, through Wednesday, Oct. 20:
- Daytime intermittent single lane closures on westbound Iliff Avenue from Parker Road (CO 83) to Wabash Street
- Daytime intermittent single lane closures on eastbound Iliff Avenue from Wabash Street to Parker Road (CO 83)
- 8:30 a.m. through 3:30 p.m., Thursday, Oct. 21, through Saturday, Oct. 23:
- Daytime right lane closures on southbound Parker Road (CO 83) at Iliff Avenue, in northwest corner of the intersection.
All work is weather-dependent and subject to change.
Third party utility work is also being completed in the area, unaffiliated with this project, requiring various lane closures.
During construction, travelers can expect daytime and nighttime traffic impacts. Intermittent daytime and nighttime lane closures should be expected. Minor impacts to bicycle and pedestrian access will be required. Access to transit stops will be maintained throughout construction.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Oct. 4
liff Avenue corridor improvements progress as Arapahoe County Public Works, along with contractor partner Concrete Express Inc., continue existing roadway, median and sidewalk removals, between South Parker Road (CO 83) and Yosemite Street. To safely remove the existing median to open the roadway for future widening, crews will conduct daytime single lane closures.?
Travel Impacts
- 8:30 a.m. through 3:30 p.m., Monday, Oct. 4, through Friday, Oct. 8:
- Daytime left lane closures on westbound Iliff Avenue from Parker Road (CO 83) to Yosemite Street?
- Daytime left lane closures on eastbound Iliff Avenue from Yosemite Street to Parker Road (CO 83)
- Daytime right lane closures on westbound Iliff Avenue from Emporia Street to Dayton Way?
All work is weather-dependent and subject to change.
Other third-party utility work is also being completed in the area, unaffiliated with this project.
In the future, travelers can expect daytime and nighttime traffic impacts. Intermittent daytime and nighttime lane closures should be expected. Minor impacts to bicycle and pedestrian access will be required. Access to transit stops will be maintained throughout construction.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Sept. 27
Iliff Avenue corridor improvements progress as Arapahoe County Public Works, along with contractor partner Concrete Express Inc., continue existing roadway, median and sidewalk removals, between South Parker Road (CO 83) and Yosemite Street. To remove the existing median to open the roadway for future widening, crews will conduct daytime single lane closures Monday, Sept. 27, through Friday, Oct. 1.
Planned improvements to Iliff Avenue include: four-lane corridor with acceleration and deceleration lanes, intersection safety modifications, bike lane and additional ADA-compliant sidewalk installations, transit stop enhancements, multi-use path/crosswalk improvements, traffic signal optimization with signal detection/ video monitoring and equipment upgrades.
Travel Impacts
- 8:30 a.m. through 3:30 p.m., Monday, Sept. 27, through Friday, Oct. 1:
- Daytime left lane closures on westbound Iliff Avenue from Parker Road (CO 83) to Yosemite St.
- Daytime left lane closures on eastbound Iliff Avenue from Yosemite Street to Parker Road (CO 83).
All work is weather-dependent and subject to change.
Other third-party utility work is also being completed in the area, unaffiliated with this project.
In the future, travelers can expect daytime and nighttime traffic impacts. Intermittent daytime and nighttime lane closures should be expected. Minor impacts to bicycle and pedestrian access will be required. Access to transit stops will be maintained throughout construction.
Stay Informed
More information is available at:
Phone: 720-773-0567
Email: Iliffave@gmail.com
Project Webpage: s.zouxigx.net/iliffcorridor
Travel Impacts for the Week of Sept. 19
Arapahoe County Public Works and Development, along with contractor partner Concrete Express Inc., has begun existing roadway and sidewalk removals, earthwork and underground testing outside the active lanes as part of the Iliff Avenue Corridor Improvement Project between South Parker Road (CO 83) and Quebec Street.
To remove the existing median to open the roadway for future widening, crews will conduct daytime single lane closures Monday, Sept. 19, through Friday, Sept. 24.
Planned improvements to Iliff Avenue include: four-lane corridor with acceleration and deceleration lanes, intersection safety modifications, bike lane and additional ADA-compliant sidewalk installations, transit stop enhancements, multi-use path/crosswalk improvements, traffic signal optimization with signal detection/ video monitoring and equipment upgrades.
Travel Impacts
- 8:30 a.m. through 3:30 p.m. Monday, Sept. 19, through Friday, Sept. 24:
- Daytime left lane closures on westbound Iliff Avenue from Emporia Street to the Highline Canal Trail.
- Daytime left lane closures on eastbound Iliff Avenue from Dayton Street to Dayton Way.
All work is weather-dependent and subject to change.
In the future, travelers can expect daytime and nighttime traffic impacts. Intermittent daytime and nighttime lane closures should be expected. Minor impacts to bicycle and pedestrian access will be required. Access to transit stops will be maintained throughout construction.
Travel Impacts for the Weekend of Sept. 11
Arapahoe County Public Works and Development, along with contractor partner Concrete Express Inc., this week started initial roadway preparations and earthwork outside the active lanes on Iliff Avenue as part of a $25.64 million Iliff Avenue Corridor Improvement Project between South Parker Road (CO 83) and Quebec Street.
To realign traffic lanes on Parker Road and Iliff Avenue and begin work outside the roadway, crews will conduct an intermittent nighttime single lane closure, starting at 6 p.m. Saturday, Sept. 11 on southbound Parker Road at Iliff Avenue until 5:30 a.m. Sunday, Sept. 12.
Planned improvements to Iliff Avenue include: four-lane corridor with acceleration and deceleration lanes, intersection safety modifications, bike lane and additional ADA-compliant sidewalk installations, transit stop enhancements, multi-use path/crosswalk improvements, traffic signal optimization with signal detection/ video monitoring and equipment upgrades.
Travel Impacts
- Intermittent lane closure on southbound Parker Road at 6 p.m. Saturday, Sept. 11, at Iliff Avenue until 5:30 a.m. Sunday, Sept. 12.
- No traffic impacts from Sept. 3 through Sept. 10.
In the future, travelers can expect daytime and nighttime traffic impacts. Intermittent daytime and nighttime lane closures should be expected. Minor impacts to bicycle and pedestrian access will be required. Access to transit stops will be maintained throughout construction.